
Outcomes from projects across Asia-Pacific. See how we've helped organisations improve their operations.

Parisian entrecote steakhouse for Black Sheep Restaurants at Two Exchange Square, in the heart of Hong Kong financial centre. The watering hole for the Exchange Square towers, running a high-turnover weekday trade of bankers and dealmakers. Delivered with client-side project management: fit-out coordination, contractor and design team management through a live Central office tower, and handover support through to opening.
Black Sheep Restaurants watering hole for the Exchange Square towers, in the heart of Central financial district, delivered through client-side project management of the fit-out, from contractor and design team coordination inside a live Central office tower through to handover and opening.

End-to-end sourcing and channel management for a designer furniture brand tapping the Chinese manufacturing value chain. Supplier identification, factory coordination, quality checkpoints, and delivery programming, acting as the client’s bridge between design intent and factory-floor reality.
USD 1M+ worth of goods sourced and delivered

A high-spec hospitality fit-out in Hong Kong required a furniture and joinery package produced through a regional factory, with prototypes running behind schedule and finishes approvals routed through the client's London office. Systematic Solutions ran the QAQC regime over the package: inspection scheduling, factory checks, defect management and rectification tracking, with an early factory QAQC visit pushed ahead of prototype completion to catch slippage at source before it hit site. The package was carried through to installation sign-off with finishes consolidated for client approval.
Furniture and joinery for a high-spec Hong Kong hospitality fit-out recovered from prototype delays through an early factory QAQC regime and carried through to installation sign-off.

The public area furniture of a Marriott-flagged hotel inside Adelaide's heritage GPO building carried the highest visibility and the lowest defect tolerance in the project. Systematic Solutions ran the full QAQC regime over the public area packages: inspection scheduling, factory checks through production, defect management and rectification tracking, through to installation sign-off inside a live CBD environment. Every public area package was confirmed at practical completion.
Public area furniture for a Marriott-flagged heritage hotel passed through a full factory-to-installation QAQC regime and closed at confirmed practical completion.

Four-bedroom, two-storey home designed by Rich Carr Architects, featuring an entry atrium, double garage and seamless indoor-outdoor transition to the pool and entertainment area. Offshore procurement for joinery, architectural windows and assorted finishes.
AUD 4.8M architect-designed home delivered with 13% saved from initial costing through alternative material sourcing.

Three-storey duplex designed by MHND Union with swimming pool, outdoor entertainment area and views over Bondi Beach. Offshore procurement for joinery, architectural windows and assorted finishes.
AUD 4.4M duplex delivered with 11% saved from initial costing through VE and alternative material sourcing.

Three-storey single dwelling designed by SJS Studio with rooftop entertainment area, swimming pool and beachside ocean views. Offshore procurement for joinery and assorted finishes.
AUD 0.8M three-storey dwelling delivered two weeks early, with 5% saved through alternative material sourcing.

Guest room furniture and joinery procurement for the Caption by Hyatt hotel: made in Vietnam with full design workshop, white wood and full prototyping, custom finishes with equal alternatives as VE. Freight and install delivered on time.
174 guest rooms of furniture and joinery delivered on time for the Caption by Hyatt Sydney, with 25t CO2e refused and 20% saved through VE sourcing.

Bespoke furniture procurement for a premium restaurant: 60+ pieces from a China factory with full QAQC, white modelling and full prototype, custom finishes, equal alternatives, fire-rating treatment and certification, delivered and placed.
60+ bespoke furniture pieces delivered and placed for a premium restaurant, 40% under market average, with 17t CO2e refused via local sourcing and optimised logistics.

Guest room and public area furniture and joinery package for 400 capsule beds, manufactured in China with full QAQC service, white modelling and full prototype, custom finishes and equal alternative options.
400 capsule beds manufactured and delivered in 55 days, 40% under market average across the full order.

Bakery patisserie in a high-tourist-traffic retail space, delivered end-to-end on a 7-week programme with client-side project management, commercial kitchen and MEP design & build, prequalified tendering, and post-handover care.
Bakery patisserie delivered end-to-end on a 50-day programme, 21% under market average at final contract with under 2% contract adjustment from 70% documentation.

Themed restaurant in a high-tourist-traffic space at The Peak, delivered end-to-end with client-side project management: full scope-out and quantity surveying, commercial kitchen and MEP design & build, prequalified tendering and evaluation, plus post-handover care.
Themed restaurant delivered end-to-end in 70 days, 21% under market average at final contract sum with a 2% scope gap recovered.

Flagship steakhouse for a premium destination, delivered end-to-end with client-side project management. Full scope-out and quantity surveying, commercial kitchen and MEP design & build, prequalified tendering and evaluation, and post-handover care.
Flagship steakhouse delivered end-to-end in 90 days, 24% under market average at contract value, with net 7% value engineering and zero scope gap.

Gelato store in a high-tourist-traffic retail space at The Peak, delivered end-to-end: full scope-out and quantity surveying, commercial kitchen and MEP design & build, prequalified tendering, and post-handover care.
Gelato store delivered end-to-end in 70 days, 21% under market average at final contract with under 2% contract adjustment from 70% documentation.

Traditional Napoli Italian restaurant delivered end-to-end with client-side project management, retaining 50% of the existing kitchen for adaptation, with full post-handover care.
Traditional Napoli restaurant delivered end-to-end in 100 days, 17% under market average with 17t CO2e avoided through alternative sourcing.

Across multiple hotel and hospitality projects, owners and operators needed an independent quality regime over their furniture supply chains: inspection scheduling, factory checks, defect management and rectification tracking through to installation sign-off. Systematic Solutions delivered the full QAQC programme on each project and closed every package at confirmed practical completion.
Full QAQC regimes delivered over furniture supply chains for multiple hotel and hospitality projects, each package closed at confirmed practical completion.

A Marriott-flagged hotel inside Adelaide's heritage GPO building required a complete furniture procurement scope, delivered into a live CBD environment with staging and sequencing constraints. Systematic Solutions ran vendor sourcing, factory coordination, quality checkpoints and delivery programming, then carried the package through to confirmed practical completion.
Complete furniture package delivered into a live CBD environment, staged and sequenced, and confirmed at practical completion for a Marriott-flagged heritage hotel.
Tell us your goals and book a consultation with our team.
Book a Consultation